wall beside service road, with
transition from travertine panels
to stuccoed concrete wall
Nov. 1997
|
same wall,
transition from travertine panels
to stuccoed concrete wall
Nov. 1997
|
same wall,
transition from travertine panels
to stuccoed concrete wall
Nov. 1997
|
service road underpass,
transition from travertine panels
to stuccoed concrete wall
Sept. 1999
|
wall of coach road
and underside of tramway
Nov. 1997
|
south promontory
Sept. 1999
|
clamps attaching travertine panels
to concrete wall,
with air space between
July 1995
|
clamps attaching travertine panels
to concrete wall
July 1995
|
edge of travertine panels
clamped to concrete wall,
with black weather protective covering
July 1995
|