Reed Canyon Enhancement Strategy
Implementation Strategy
Lower Lake Management Zone | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Timing of Tasks |
||||||||||||
Tasks |
J |
F |
M |
A |
M |
J |
J |
A |
S |
O |
N |
D |
Restore headwater forest on slopes (approx 30,000 sq ft) |
||||||||||||
Hire labor crews to remove in areas with native veg conflicts |
X |
X |
X |
X |
X |
|||||||
Coordinate and conduct bi-annual volunteer ivy/ blackberry pull |
X |
X |
X |
X |
||||||||
Work with neighbors to remove invasives on their property |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Seed freshly cleared areas with regreen or sterile wheat for ec |
X |
X |
X |
X |
||||||||
Monitor and periodically remove new invasive growth |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Revegetate cleared areas with native plant material |
X |
X |
X |
X |
||||||||
Coordinate bi-annual volunteer planting day |
X |
X |
||||||||||
Trail system |
||||||||||||
Survey current and potential future location for trails |
X |
X |
X |
|||||||||
Regrade trail to a 3' width, 15' away from water's edge (min 1500 ft) |
X |
X |
X |
|||||||||
Commons area view / northern lake edge |
||||||||||||
Secure permit for in-water work at small emergent marsh to north |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Use aquatic weed harvester to remove reed canarygrass |
X |
X |
X |
|||||||||
Elevate water level to a depth of 3' in winter during harvest |
X |
X |
X |
|||||||||
Install erosion control / sediment traps at sewerline crossing |
X |
X |
X |
|||||||||
Use backhoe to remove rcg near edge and in drier locations |
X |
X |
||||||||||
Dewater harvested material near access road |
X |
X |
X |
|||||||||
Monitor and periodically remove new invasive growth |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Revegetate edge with riparian edge plant community |
X |
X |
X |
X |
X |